General Information

Part 1: General Information

Company Name Telephone
Project Owner Name Fax
Position Email
Mailing Address Line 1 Industry
Mailing Address Line 2 Plant Site Location  
City Name
State City
Zip State
       

Comments

Would you like to join our mailing list?

Yes, please
No, thank you

Please continue to the next tab above.

Project Specifics

Part 2: Biomass Fuel Available for the Project

Biomass Type(e.g. wood chips, sawdust, mulch, agri-residues, paper, etc.) Annual Tons Available Avg Rate Hourly Avg Weekly Operation Hours % Fuel Moisture (please state wet or dry basis) Gross Heating Value, BTu/lb

Typical Fuels: Sawdust, sanding dust, wood chips, bark, mulch, pallets, wood mulch, fuels with high dirt content, pulp & paper waste, medium density fiber (MDF), other agricultural residues, select municipal waste, fats/oils, coal, bovine manure, chicken litter, etc.
Fuel Testing:

Alternative Energy Solutions maintains a testing facility where opportunity fuels (biomass) can be assessed for performance. Through testing in our gasification system, valuable information can be obtained about an opportunity fuel’s BTU value, ash characteristics and unique handling needs.

I may be interested in testing my opportunity fuel

Part 3: Output Energy Requirement

Type of Output (e.g. hot Air, Hot Water, Steam, Electricity) Heat Output Needed (e.g. MMBTU/hr, Boiler Hp, GPM@temp, CFM @temp) Description of heat Output (e.g. steam flow, temp, pressure, etc.)

Part 4: Current Energy Expense

Energy Source (e.g. natural gas, electricity, etc.) Energy Supplier (optional) Monthly use rate (state units) Monthly cost

Part 5: Current Waste Disposal Expense

Biomass Source Trucking fee Tipping fee Total Cost

Part 6: Preferred Project Type

Eng. and Proprietary Equip. Supply Build Own Operate (BOO) or Lease (BoL)
Eng. and Total Equip. Supply Other (Please State)
Total Installation (TurnKey)

Please continue to the next tab above.

Additional Information

Part 7: Additional Information

Filling out this additional information is optional, but will greatly expedite your inquiry response.

Current Project Status

Concept
Design
Finalized

Installation Type




Use of Energy Generated

Internal Use
For Sale

Fuel Analysis



Financing Status





Site Sketch (Upload an image)
Financing Assistance





Current Power Rate (US cents / kWh)
Preferred Date of Construction (Month and Year) Anticipated PPA price if power is to be sold to the grid (US cents / kWh)
Non-standard requirements, codes, regulations (Please Specify)

Is there a minimum clearance for equipment?

If yes please specify, if no please explain



This information is considered confidential and will be managed as such by AESI regardless of whether
or not a project is generated.

Powered By ChronoForms - ChronoEngine.com